new flat in Halifax and extension work in pe28 ( 基本每日每周更新进展直至项目完成,也可以电话交流)

We started the work on the ground floor


Painting on the first floor

Another room on the first floor is Full replastered

Another room on the first floor is Full replastered


Replastering in Living room



Painting on the first floor

刷了墙果然好看多了 地板也是个烧钱的部分

Plastering in the ground floor started to be dry


This is just the first coat, we need put some filler and Sand the Wall again and paintball the second coat later

We put plasterboard on the Ceiling of the bathroom and toilet

Rewiring is almost done and we took the Wall paper out from the Wall on the ground floor Living room


Electrician works on the first floor

Electrician works in the Kitchen

Plastering another two Walls in the Kitchen on the ground floor

This Wall 's condition was very bad, so we did one coat knauf then did the plasteting, it is finally fine now

This Wall in the Kitchen is finally fine

Another two Walls in the Living room has been Sanded and be prepared for the first coat paint

The Wall has been Sanded

We repair all the walls in the Living room on the ground, and start to do the plastering


We repair all the walls in the Living room on the ground, and start to do the plastering