survey回来感觉打2分的问题比3分的还要严重

大家帮忙看看是不是这样子

打2分的有
The pitched roof is covered with concrete tiles laid over a secondary waterproof barrier (roofing felt). This has torn and while it has been repaired, the laps are still open. Water may get into the roof space especially during windy weather. The roof may have a limited life and you should plan/
budget to recover it. Meanwhile it should be repaired.
Also ridge tiles need repointing. To repair roofs safely and without damaging the roof covering, contractors should use appropriate access equipment (e.g. scaffolding, hydraulic platforms, etc.). Condition Rating 2

Without a protective decorative finish, timber will rot requiring costly repairs. To prevent this, you should redecorate the external surfaces soon. Before decoration, most external surfaces need preparation and some repair. Although this is normal, this repair work can increase the cost of the work. To redecorate external surfaces safely, contractors should use appropriate access equipment (e.g. scaffolding, hydraulic platforms, etc.). Condition Rating 2

Internally mastic seals between the units and their frames are not properly mitred ie the units may need replacing soon.

打3分的除了常规的电,气这些之外还有
Externally the sealant at the junction between the walls and the windows is poorly applied. The junction must be sealed to prevent the adjacent surfaces being damaged by water. You should repair the sealant soon. Condition Rating 3.

The gas fired Worcester Greenstar RI boiler in the kitchen is connected to an external fan assisted flue. Modern heating appliances are connected to flue pipes that should allow combustion gases to escape safely and the heating appliance to work efficiently. Strict regulations govern the positioning of these flues and, like all parts of a heating system a competent person (see section G4) should check them annually. I saw no evidence that this has been done. Condition Rating 3

这么多问题还是pull out吧

请问哪个问题值得pull out ???
我看上去都不是什么大问题啊