Landing floor slightly slopes away from the stairs?

大家好,剛剛買了HOUSE但從agent收到以下郵件:

The property has been completed and everything has been signed off in accordance with building regulations, however the developers have noticed the landing floor slightly slopes away from the stairs, the inspector that signed off the properties didn’t see this as an issue however the developers raised it as a snagging point when they snagged the property.

The developers are offering you two options which we believe are fair and reasonable.

Option 1

The developer will arrange for the contractors to fix the landing slope (the cost of this is expected to be £5,000) which the developers will pay for, however the works will take around 2 months to fix. Which means you wont be able to move into the property until the works have been completed.

Option 2

You can complete on the property now, as the property has been signed off in accordance with building regulations. The developers will not arrange for the landing to be fixed but they have offered £5,000 as a good will gesture.

真的很糾結,不知道該如何是好. 請問大家有如何看法?

你现在到底什么状态?是reserved? exchanged? 还是completed?你现在住哪?是租还是自住?

当然是让他们修好了你再搬啊 你自己找的人如果修不好或者超过£5000 都是要自己承担责任的

先去看看多严重啊, 可忽略的就拿5000镑了。 但既然他们已经主动提出这问题了, 那问题肯定是很严重了, 还是要他们修好算了。

他们说了building regulations没问题, 就是意思说拖延2个月他们也不会对你做更多的补偿了。 可以问问律师开发商可以用这种理由拖延2个星期不给补偿吗

先问问律师的建议,他们经验相对多。而且只是给修不公平,建议:
Option1, 让他们修,并要求2个月迟交房的赔偿。如果2个月还是交不了就再附加赔偿。

谢谢大家。吸取您们和律师的建议,我已通知发展商作出修改以及3K的延误赔偿,但律师不能保证能得到赔偿因为我方和发展商之前没有协定的完成日期。

哪家开发商啊,还能出这种问题!希望lz能拿到补偿!