The first floor hallway plasteting already dry
Sanding another two walls and put the first coat painting
5-6k only for the cost of material, you labour not included…right?
The Cost of the materiałs is not too much, and me and my friends are builders, that is why Our labour cost is not that much, Total cost will be around 7000 to 8000, we will not change the Kitchen and bathroom, so the cost is Lowe for us because we decide to change two Windows and the front door, because it is Our investment flat for sale in 1 Month
We do not change the skirting board even, if you Would need to do a proper job, it will cost more for sure, we will not to do too much works in this flat, we brought this. Flat for around 49000 and plan to sell it for 72000 73000, we Would spend maximum 10000 on the top, this place is near to Halifax not London
We Brought plasterboard, rewiring stuff, PVA, some insulation, sockets painting Tools and paint, Sand paper. 16 bags Multifinish and Bonding, 3 bags of cement, we have all the Tools, that is why Our cost is even lower
We have another time delivery of two Windows and one front door and 4 buckets of paint and 2 cans of high Gross,two cans of wood filler for Wooden door Frame, door and skirting board