new flat in Halifax and extension work in pe28 ( 基本每日每周更新进展直至项目完成,也可以电话交流)

After repair the Ceiling, we put another coat mix with a Little bit Water it looks better than yesterday




We Sand the edges of the room on the first Floor, we need to put some filler in the corners of the room


We put filler on each corner of those two room on the first floor


Bathroom Ceiling as been painted

We will paint the second coat in Living room after tomorrow

Put filler in two rooms on the first floor


Sanding the room and prepare To give the first coat on the Ceiling

We decide to change the Old skirting board on the first floor two bedroom


Clean it up and wating for the skirtingborad delivery


We change the door

We went back to London 4 days ago and we have another project near to Peter Borough ,this is a extension and interior refurbishment work ,our investment project in Halifax will be finished after we finish the project in peter Borough ,the post code is pe 28 5uj





Here is the kitchen extension and new bathroom and toilet



The first floor and ground floor

Our proposed plan


Our tiling works in peter Borough



Kitchen extension in peter Borough PE28 ,we started work 11 weeks ago



The new boiler and tiling



Electrician and painting work in the shed

New windows and new roof tiles in extension part and original part of the house


Some works got done outside of the house