Dig Holes & Place Posts
Set The Posts With Postcrete
Measure for Square, Level, & Plumb
Cut Off Excess Height Posts
Check The Level Again
Install Base Joists
Fit Noggins
Keep Building
The Base Framing is Complete
Apply Flashing Tapes
Extra Protection For Timbers
Fasten Deck Boards
The Porch Area
The Base Is Built Now
Decking Paint Treatment
Tongue & Groove Shed Floor
Start To Build The Shed
Set Wall Panels
Roofing & Felt, Doors & Windows
Exterior Wall Painting
Electrical Junction Box
Wiring Double Sockets
Fitting The Lights
View From The Opposite Corner
Fitting Insulation Boards
Insulate Ceiling Boards
Apply Aluminium Foil Tape
Cladding Panels From Scrap
Ceiling Panels are fitted
Fit Standard Grade Hardboards
Budget Option for Interior Wall
Fill And Cover Gaps
Tool Wall & Shelves
Garden Tools, Hand Tools, Power Tools
所有工作都是一个人独立完成,剩下还有RAILING & GAZEBO没做。不过也不急哈`
Plan & Design
THE BASE WAS REDUCED IN SIZE TO AVOID AFFECTING THE CURRENT WHITE SHED FOUNDATION (ADDED HALF METER GAP) AND TO IMPROVE DRAINAGE.
A SMALLER SHED WHICH COULD AVOID NEW PLANNING PERMISSION OR OTHER POTENTIAL LEGAL ISSUES.
Base
Shed
我因为平时工作很忙,只能回家后抽出一点点时间做这个项目。还好自己不用赶工,想做就做,累了就停几天。
LOG | DATE | JOB DESCRIPTION |
---|---|---|
STEP 1: PREPARATION | ||
DAY 01: 2-HOURS | 26/01/2023 THURSDAY | PREPARE THE SITE; TRIM TREE BRANCHES. |
DAY 02: 3-HOURS | 01/02/2023 WEDNESDAY | GROUND CLEANING; FOUNDATION MEASUREMENTS. |
DAY 03: 2-HOURS | 03/02/2023 FRIDAY | SITE RUBBISH REMOVAL. |
STEP 2: FOUNDATION | ||
DAY 04: 1-HOUR | 16/03/2023 THURSDAY | DIG 10 x HOLES FOR FOUNDATION SUPPORT POSTS. |
DAY 05: 1½-HOURS | 17/03/2023 FRIDAY | PLACE 10 x SUPPORT POSTS, SET WITH POSTCRETE. |
DAY 06: 2-HOURS | 18/03/2023 SATURDAY | LAY EXTERIOR JOISTS; CUT OFF EXCESS POSTS. |
DAY 07: 2-HOURS | 19/03/2023 SUNDAY | COVER GROUND CONTROLS; INSTALL 4 x INTERIOR JOISTS. |
DAY 08: 3-HOURS | 20/03/2023 MONDAY | INSTALL 6 x INTERIOR JOISTS. |
DAY 09: 1-HOUR | 21/03/2023 TUESDAY | INSTALL 4 x INTERIOR JOISTS. |
DAY 10: 2-HOURS | 22/03/2023 WEDNESDAY | INSTALL 2 x INTERIOR JOISTS, & 9 x NOGGINS. |
DAY 11: 2-HOURS | 23/03/2023 THURSDAY | FIT 17 x DECKING NOGGINS. |
DAY 12: 2-HOURS | 24/03/2023 FRIDAY | FIT 15 x DECKING NOGGINS. |
DAY 13: 4-HOURS | 25/03/2023 SATURDAY | FIT 9 x NOGGINS, & 6 x SITE PEGS; APPLY FLASHING TAPE. |
STEP 3: DECKING | ||
DAY 14: 3-HOURS | 27/03/2023 MONDAY | FASTEN 6 x DECK BOARDS. |
DAY 15: 2-HOURS | 30/03/2023 THURSDAY | FASTEN 10 x DECK BOARDS. |
DAY 16: 2-HOURS | 31/03/2023 FRIDAY | FASTEN 6 x DECK BOARDS. |
DAY 17: 1-HOUR | 01/04/2023 SATURDAY | FASTEN 4 x DECK BOARDS; INSTALL DECK STAIRS. |
DAY 18: 2-HOURS | 07/04/2023 FRIDAY | DECKING PAINT TREATMENT. |
STEP 4: PENT SHED | ||
DAY 19: 3-HOURS | 17/04/2023 MONDAY | INSTALL SHED FLOOR, FRAME, WALL. |
DAY 20: 3-HOURS | 18/04/2023 TUESDAY | INSTALL SHED ROOF, WINDOWS, DOORS. |
DAY 21: 2-HOURS | 19/04/2023 WEDNESDAY | INSTALL CLOAKING STRIP, FELT, GUTTER. |
DAY 22: 3-HOURS | 22/04/2023 SATURDAY | EXTERIOR PAINTING. |
DAY 23: 1½-HOURS | 24/04/2023 MONDAY | WIRING THE SOCKET & LIGHTING. |
DAY 24: 3-HOURS | 26/04/2023 WEDNESDAY | FIT INSULATION BOARDS. |
DAY 25: 1½-HOURS | 27/04/2023 THURSDAY | APPLY ALUMINIUM FOIL TAPE. |
DAY 26: 2-HOURS | 29/04/2023 SATURDAY | INSTALL PVC CEILING PANELS. |
DAY 27: 3-HOURS | 06/05/2023 SATURDAY | INSTALL INTERIOR WALL PANELS. |
DAY 28: 1-HOUR | 08/05/2023 MONDAY | FILL GAPS, APPLY SILICONE SEALANT. |
DAY 29: 2-HOURS | 13/05/2023 SATURDAY | PUT UP SHELVES, HANG TOOLS. |
STEP 5: RAILINGS | ||
DAY 30: N-HOURS | DD/05/2023 DAY | N/A. |
Costs:
MATERIAL | DESCRIPTION | QTY | UNIT |
---|---|---|---|
CONCRETE | BLUE CIRCLE POSTCRETE 20KG | 5 | £6.40 |
POSTS | 100MM x 100MM (4" x 4") TREATED - 2.40 METER | 2 | £30.00 |
44MM x 44MM (1" x 1") TREATED SITE PEGS - 450MM | 5 | £0.90 | |
TIMBER JOISTS | 150MM x 47MM (6" x 2") TREATED SOFTWOOD - 3.00 METER | 10 | £10.29 |
150MM x 47MM (6" x 2") TREATED SOFTWOOD - 3.60 METER | 9 | £12.36 | |
SCREWS | HEX FLANGE COACH SCREWS M6 X 90MM 100 PACK | 1 | £9.99 |
GOLDSCREW WOODSCREWS 4.0 x 30MM 200 PACK | 1 | £2.89 | |
GOLDSCREW WOODSCREWS 3.5 x 40MM 200 PACK | 1 | £2.79 | |
GOLDSCREW WOODSCREWS 4.0 x 40MM 200 PACK | 1 | £3.69 | |
GOLDSCREW WOODSCREWS 5.0 x 80MM 100 PACK | 1 | £5.29 | |
SINGLE THREAD SCREW 4.5 x 40MM 200 PACK | 1 | £3.63 | |
SINGLE THREAD SCREW 5.0 x 80MM 100 PACK | 1 | £4.44 | |
TIMBADECK DECKING SCREWS 4.5 x 75MM 500 PACK | 1 | £22.99 | |
HANGERS | SABREFIX HANGERS 50 x 275MM 10 PACK | 2 | £11.49 |
TIMBER TO TIMBER HANGER 47 x 272MM 10 PACK | 1 | £11.49 | |
DECKING | FLASHING TAPE BLACK 50MM x 50M | 1 | £3.98 |
150MM x 47MM (6" x 2") TREATED - 4.20 METER | 13 | £14.41 | |
150MM x 47MM (6" x 2") TREATED - 3.60 METER | 3 | £12.35 | |
ANTI-SLIP DECKING STAIN DARK MAHOGANY 2.5LTR | 1 | £15.99 | |
SHED | HOBBYIST PENT SHED 14x6 | 1 | £850 |
GUTTERING KITS | 1 | £80.00 | |
SQUIRE DIE-CAST STEEL COMBINATION LOCKING BOLT 120MM | 1 | £15.49 | |
KAY METZELER POLYSTYRENE EPS70 2400x1200x25MM | 8 | £11.50 | |
RHINO SELF ADHESIVE FOIL TAPE 75MM x 45M | 2 | £6.50 | |
ELECTRICITY | 13A FUSED TOUGH PLUG BLACK | 1 | £2.12 |
BRITISH GENERAL IP55 WEATHERPROOF ENCLOSURE 75x53x85MM | 1 | £3.79 | |
BRITISH GENERAL IP66 13A 2-GANG DP WEATHERPROOF SOCKET | 1 | £8.99 | |
PLASTIC PIPE CLIPS 22MM PK15 | 1 | £0.70 | |
2-GANG SWITCHED SOCKET | 1 | £8.99 | |
LWM 25MM 2-GANG SURFACE PATTRESS MOULDED BOX | 1 | £1.77 | |
MK LOGIC PLUS 10AX 2-GANG 2-WAY LIGHT SWITCH | 1 | £3.49 | |
1-GANG PATTRESS BACK BOX 47MM | 1 | £1.90 | |
ANGLE BATTEN LAMPHOLDER BC 2.52" | 2 | £1.89 | |
SYLVANIA TOLEDO BC LED LIGHT BULB 806LM 6.5W | 2 | £2.98 | |
LAP TWIN AND EARTH CLIPS 1-1.5MM 100 PACK | 1 | £1.33 | |
LUTEC VIENNA UP&DOWN WALL LIGHT | 1 | £12.00 |
A Little Bit Extra:
Every carpenter has a bit of Obsessive-Compulsive Disorder
Slowness Produces Better Results
Wood Burning Practice
Question: For the Shed Label, Stencil or Wood Burning?
太厉害了
电也可以自己弄? 不需要电工带证的? 我也喜欢DIY但是无从下手
动手能力太强了!我们最近刚好也在研究summer house.
顺便问一下,打桩就够了吗?我以为必须挖沟打地基才行哎!我们想建这种,不打地基的话不知道能不能扛住英国的妖风。
那么大工程,了得的。
牛!!
我也正在弄,还在平地,建在花园尽头。地面有坡度,比平的地方高了25cm,我正在纯手工挖, 好费工费时。原来想偷懒直接铺好base,假上本身地势高于两边邻居,shed看起来太高了,怕被邻居告去council,由掀开下挖。于是又有个新问题,如何排水?因为挖的工程太费力,我只挖shed base 那么大,fence两侧也不敢下挖,怕影响fence稳固以及悬空,所以到时肯定会积水。要是挖了全部用水泥或者其他材料硬化,增加成本和人工——我也是自己一个人干,没帮手,所以本着坚固耐用的原则下尽量简单少工时少力气。